When embarking on a home construction project, especially as a first-time builder, you may encounter unfamiliar terminology and overlooked details. This comprehensive guide aims to equip you with crucial questions to ask your builder, ensuring a smooth and transparent building process.

 

Contract and Pricing: Footing Costs

Q: “Will the footings be fixed price in the contract?”

Builders often use a “PC sum” (Prime Cost sum) for footings before soil tests and engineering are completed. This estimate can be conservative, potentially leading to unexpected costs. While surprises can occur during excavation, obtaining as much information upfront is crucial for accurate budgeting.

Note
Any item listed as a PC Sum in your contract is the builder’s allowance, not a fixed price.

 

Inclusions and Specifications

Q: What specifications are included in my contract?

Display homes often showcase premium features that may not be standard. Clarify the following to understand exactly what finish you’re getting:

  • Insulation: Size and locations (external walls, internal walls, ceiling, floor)
  • Ceiling heights: 2400mm or 2700mm?
  • Door sizes: 2100mm or 2400mm high?
  • Bathroom tiling: Height and cost allowance for tile selection
  • Trim details: Skirting, architrave, and cornice dimensions

 

Q: Are external works included in my contract? If not, can you provide a quote?

External works can significantly increase your build cost, especially on sloping blocks. Items to consider:

  • Retaining walls
  • Stormwater connections to the street
  • Paving
  • Crossovers

Getting quotes for these elements beforehand helps in determining an accurate budget to fully complete your home.

 

Communication and Site Access

Q: “Do I have a dedicated site supervisor, and when can I look through my new home?”

Once construction begins, it’s very exciting, and you’ll want to check on progress as it happens. There will also be questions that arise when you see things go from plans to your real home.

At AGH, you will have a dedicated site supervisor whom you will meet onsite once your foundations are poured. They will give you weekly updates via the client interface app, including what has been completed onsite and images for you to see.

Builders have varying policies on client site access due to safety concerns. It’s crucial to be accompanied by a site supervisor or a representative from the building company when entering the site during construction. At AGH, we have set times when your supervisor will invite you to meet them onsite. These include:

After foundation pouring 
Meet your dedicated site supervisor

Electrical walkthrough
After framing, roofing, external cladding, and plumbing, but before gyprock installation

Tiling layout walkthrough
Confirm tile selections and layouts on-site

Second fix inspection
After cabinetry installation, confirm locations of feature lighting, towel rails, and mirrors

Pre-handover and final handover walkthroughs
Ensure complete satisfaction with the home’s finish

 

Timeline and References

Q: Do your projects often run over time

Unforeseen delays can occur due to weather conditions or supply difficulties. Some builders quote unrealistic timeframes that can easily slip off schedule. A reputable builder will set a realistic schedule that allows for client checks and inspections along the way, ensuring a quality build and client satisfaction upon completion.

 

Q: Can I speak with someone who has recently built with you about their experience

A recent client can provide direct feedback on their building experience, offering valuable insights into the builder’s process and customer service.

Remember, there are no trivial questions when it comes to building your home. Clear communication and understanding between you and your builder are fundamental to a successful project.

 

Read Post
Latest Posts

Make an enquiry

Please note we only work with new builds, not renovations or extensions to existing properties.

Our current build radius is approx. 50kms from CBD from Gawler across to Mt Barker, Strathalbyn down to Sellicks Beach.

Please enquire if your property is on this border.